Effective tips for installing a pumping station for sewage

sewage pump

You have done your research and found the right sewage pumping station. That is brilliant but you should plan how to install sewage pump correctly. While installation may seem like a complicated task to do, but when done by a qualified person, it is relatively straightforward. Here is a complete guide for installing a pumping station for sewage.

Choose the right location

Your pumping station in Australia will need to be installed below ground level. It is therefore important to think carefully about the exact location you want to install your pumping system. It is important to allow for falls in the drainage system of the site and before you begin to dig, you should check for underground cables, pipes and service ducts. If your tank needs to be installed under a footpath or road, it will need additional provisions such as a manhole cover which should be bought before you begin the installation process.

Excavate the opening

You should now take the next step and dig a hole for your pumping station. You should do it approximately 500 mm deeper than the length of the tank. If it is dug by hand then the sides should be shored up to prevent slippage. If you dig by machine, they should be battened properly for stability. A dewatering pump may be necessary when it comes to draining away groundwater.

Prepare for excavation

The next step in installing a sewage pumping station near you in Australia is to prepare for excavation. This will need to be around 200mm thick. However, if the ground conditions are good, you can go for anything above 50mm. You should cover the hardcore with a concrete layer and compact and consolidate them.

Install the Sewage Pump

Now you are ready to start the installation. You should slowly lower the tank of the pumping station onto the base and allow the moldings to settle into the concrete. You must ensure the connections and the pipes are correctly positioned. In case the inlet socket is less than eight hundred millimeters from the base of the tank, you should ensure you connect it at this stage.

Ensure you secure the Sewage Pump

When you are happy with the tank’s position, you should fill it with water and secure it in place. You can use 25-grade concrete to do so. Make sure you pour this evenly around the tank’s periphery to about 600mm height and 100mm thickness. You should then connect all pipework on the pump station and grade 25 concrete to backfill.

Make the final connections

Wiring is the final stage of installing your sewage pumping station. You should give the concrete enough time to set and get rid of water from the tank. You are then free to install the float switches, ensure the control panel is positioned accurately and make the final connections. Once everything has been installed, you should do a test to ensure there are no problems with your system. Make sure a professional inspect the project.